A student body of 5,851 sits behind the fall 2024 enrollment figure that Southeastern Oklahoma State University in Durant reports, and in another part of the state Oklahoma State University is listed with 6,007 employees among the largest employers in Stillwater. Campuses of that size shape their towns, and they create a housing need that is unlike any other: tens or hundreds of beds that must all be ready on one weekend in August, occupied by residents who have never lived on their own, and wear on the building for nine months a year.

Student housing is the multifamily building type with the least forgiving deadline. A garden apartment community that finishes three weeks late loses three weeks of rent; a residence hall or student apartment building that finishes three weeks late loses a semester of students who signed other leases. We build for universities, developers and private operators, on campus and off, and we plan every project backward from move-in day, which does not move.

Move-in day is the schedule

We start with the date students arrive and work backward through furniture delivery, final cleaning, certificate of occupancy, fire alarm acceptance and the dry-in date that makes interior work possible. Each of those has float measured in days, not weeks, and the schedule shows where it is thinnest. A one-year project that starts in the fall generally has a few winter months of interior work and a hard stop in August. A project that starts in the spring has a tougher path.

On multi-building projects we deliver buildings in sequence and turn the first over for furniture while later buildings are being finished. A partial opening is sometimes possible, but only with a plan: students and parents arriving at a site where trucks and cranes are still working need safe walkways, signs and a staffed check-in. We build these into the schedule and the site logistics, and we agree on them with the owner's residence life staff well in advance.

Where student housing gets built in Oklahoma

The big public universities draw the most attention, but regional universities create steady demand. Southwestern Oklahoma State University in Weatherford reached more than 4,200 undergraduates and graduate students by 2015 and, according to Wikipedia, is the largest institution of higher education in western Oklahoma. Those campuses sit in small cities where the construction labor pool is thin and where a project may compete with other work for crews.

We know how to plan for it. In Durant, Stillwater and Weatherford, we assume that some trades will travel in, that lodging for crews has to be arranged early and that inspection schedules need to be confirmed with the city. A project that plans for these conditions finishes on time; one that assumes metro conditions does not. We also ask each owner to name a single decision-maker on campus, because a housing project with five approvers moves at the speed of the slowest one.

Residence halls, suites and apartments

Student housing comes in several forms. Traditional residence halls have double rooms, shared baths and common lounges. Suite-style buildings group bedrooms around a shared bath and living area. Apartment-style buildings have individual kitchens and are leased by the bed. Each has a different mechanical and plumbing density and a different code treatment for fire separation, egress and accessibility.

Common features include secure entries, card access, strong wireless networks, laundry, study rooms, fitness spaces and bicycle storage. Parking is another large element, and the trade partner team for parking lot construction can build surface lots on the same schedule. For owners who want a broader view, our page on education and school buildings explains the related building type.

Cost per bed and what moves it

Student housing is priced per bed, and owners compare projects on that number. The main drivers are unit type, building height, shared amenity space and finish durability. Rooms that are cheap to build but wear quickly cost more over time, so we advise on flooring, wall protection, door hardware and fixtures that survive heavy use.

Furniture and technology are often a separate package with its own procurement, and delivery lead times can run weeks. We coordinate long-lead procurement so that furniture, appliances, door hardware and access control arrive when floors are ready. Where a campus uses public funds, our education facility construction page explains the bidding and bonding rules that apply.

Universities, developers and operators

Universities procure student housing in several ways: public bid, construction management, or partnerships with private developers who build on or near campus. Each has its own contract, funding and risk allocation. A public university following the state's competitive bidding rules needs a bid package with bonds and security, while a private operator may negotiate.

Our work with education institutions describes the processes in detail. We work with design teams that already have a prototype and with owners starting from a program, and we tell owners early whether the site, the schedule and the budget are consistent with one another.

Plan your student housing project before the semester plan does

Send us the campus, the bed count and the date students arrive. We will return a schedule that works backward from move-in, a budget per bed and the list of decisions that must be made first. Use the contact form and we will set up a call.

FAQ

Common Questions

How early do we need to start to open by August?
What if the building is not ready by move-in?
What finishes survive student use?
Can you build on a campus with students present?
Do small-town student housing projects cost more?
Commercial construction project in Oklahoma

Ready to talk about your project?

Send the property, the building type and the schedule. We review the scope, the approvals and the trade packages and explain how the project would be sequenced.

Plan Your Oklahoma Project

Send the property, the building type and the schedule. We review the scope, the approvals and the trade packages and explain how the project would be sequenced.
Call405-972-6094